Kinmo PW Solar Feasibility Tool
See your 25-year solar savings in seconds.
Investment Analysis
25-year net profit: — see full breakdown
See a financing scenario (illustrative)
Illustrative estimate only — not a loan offer. Actual terms depend on your financing provider.
* All prices shown are VAT-exclusive. Lifetime model assumes 0.4%/yr panel degradation (premium Tier 1), 4.5%/yr electricity rate inflation (Meralco historical CAGR), annual O&M (1.5–2.0% of contract price depending on scale), and one inverter replacement at Year 12 (~10% of solar cost). Rough estimate only — request a formal quotation for final ROI and hardware scope.
25-Year Savings Projection
Monthly Savings Breakdown
1. Grid-Tied (Direct)
Direct self-consumption during daytime hours
2. With Net Metering
Exporting surplus energy to the grid
System Specifications
Recommended Equipment
Indicative — final design upon site assessment.
System Configuration Details
Energy Flow Summary
- Monthly Solar Generation: 0.0 kWh
- Direct Consumption: 0.0 kWh
- Surplus Solar: 0.0 kWh
- Monthly Usage Requirement: 0.0 kWh
Battery Recommendation
Compare scenarios & what-if analysis
System Type Comparison
Same inputs applied across all system types for direct comparison.
| Metric | Grid-Tied | Hybrid | Off-Grid |
|---|
Sensitivity Analysis
Impact of variable changes on your investment returns.
What You Get With Kinmo PW
Equipment we install
- GoodWe — Tier-1 hybrid inverters
Backed by Kinmo PW's own power-quality brands — Northstar, UNI-T and YIY — so your solar runs on clean, stable power.
Why Kinmo PW
- Professional installation and on-site assessment
- We handle your net-metering application with your utility
- Manufacturer-backed equipment warranties
- Support across Luzon, Visayas and Mindanao
Get Your Custom Solar Report
Receive a professional PDF summary of your solar feasibility analysis, including detailed ROI projections and system specifications.